We have been engaged in design aspects of various Transport Infrastructure Projects through all their design development phases. The designs carried out in various capacities include earthworks & bridges, hydrology & hydraulic studies, geotechnical studies, railway track alignment, road pavements, railway operation modelling, signalling & communication studies, overhead line equipment studies, constructibility reviews, planning & scheduling, CAPEX & OPEX studies and preparation of reports at various stages from concept to commissioning.

Location: Western Australia
Client: BCI Minerals
Duration: Feb 2023 – Apr 2023
Project Details:  Design review and Value engineering for the Access Road to the jetty

Location: Sydney, NSW, Australia
Client:  Pinsent Masons
Duration: Nov 2022 – March 2023
Project Details: Analysis and reporting of welding of the rails on sections of the Sydney Light Rail Project (SLR Project).

Location: Queensland, Australia
Client: Bowen Rail Company, Australia
Duration: Nov 2022 – March 2023
Project Details: Concept design for Passing loops expansion and Mineloop reconfiguration to increase the capacity of Carmichael Mine Rail Project

Location: Queensland, Australia
Client: Logan City Council, Australia
Duration: July 2022 – August 2022
Project Details: Civil Design works to reduce the dead loads of surfacing and design of asphalt resurfacing

Location: Queensland, Australia
Client: Logan City Council, Australia
Duration: March 2022 – June 2022
Project Details: Load assessment for a 5 NHVR vehicle applications, 4 standardised assessment vehicles and T44 design load.

Location: Queensland, Australia
Client: Bowen Rail Pty Ltd
Duration: June 2021 – June 2022
Project Details: RFI and construction query support to client. As-built engineering support and certification

Location: Queensland, Australia
Client: Bravus Mining and Resources
Duration: October 2020 – April 2022
Project Details: RFI support to client, based on queries from contractors/ As Built Engineering support and certification

Location: Queensland, Australia
Client: Bowen Rail Pty Ltd
Duration: February 2020 – April 2021
Project Details:Detailed design for rail provisioning and maintenance yard involving design of rail alignment, tracks, earthworks, drainage, service track, signalling and facilities

Location: Queensland, Australia
Client: Seymour Whyte Constructions Pty Ltd
Duration: October 2020 – February 2021
Project Details: Drafting of As-constructed drawings as per the client requirements

Location: Queensland, Australia
Client: Dowen Rail Pty Ltd
Duration: April 2020 – October 2020
Project Details: Detailed design of provisioning yard connection point into the Aurizon Network’s ‘Newlands System’

Location: Queensland, Australia
Client: Adani Mining Pty Ltd
Duration: February 2020 – September 2020
Project Details: Detailed Design work including Civil, H&H, Alignment, Drainage, Geotech, Bridges, Culverts for 200 km of rail line.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: September 2019 – March 2020
Project Details: Design support for client to undertake Detailed Design Review in the field of Civil and Signalling.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd
Duration: December 2019 – February 2020
Project Details: Design review (including Civil, H&H, Alignment, Drainage Geotech, Bridges, Culverts) of DCP3 deliverables for 200 km Rail Line.

Location: Varsity to Burleigh, Queensland, Australia
Client: Seymour Whyte Constructions Pty Ltd
Duration: January 2020
Project Details: Material Take off/Quantity estimation.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: April 2017 – May 2018
Project Details: Hydrology & Hydraulic design, Drainage and Crossings design for 382km long heavy haul rail line.

Location: Queensland, Australia
Client: Fulton Hogan
Duration: January 2016 – June 2016
Project Details: Design and construction of 2 QR timber bridge replacement of Kings Bridge (72m long) and German Bridge (15m long).

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: December 2015 – January 2016
Project Details: Assess the alternate connection location with Aurizon and recommend the best option from considerations.

Location: Queensland, Australia
Client: NRW, Australia
Duration: December 2014
Project Details: Design and preparation of BOQ for Road Alignment, Pavement Design, Hardstands, Catchment delineation and 1D modeling of all culverts along the road, Construction of water pond.

Location: Queensland, Australia
Client: POSCO E&C
Duration: June 2014 – December 2014
Project Details: Collaborative work with WorleyParsons project team to deliver the Basic Engineering report / FEED report for 388Km long Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway {Narrow Gauge & Standard Gauge}.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Austra alia
Duration: October – November 2014
Project Details: Adani Mining is proposing to develop thermal coal mine in North Galilee Basin, Central Queensland. For the effective operation of mine, suitable road link to the major regional centres of Townsville, Mackay and Rockhampton must be established. This project consists of design of 90 km long road between Elgin-Moray Road and Moray- Carmichael Road which is at present a rural unsealed road. Design works for hydrologic, hydraulic and structure design were undertaken.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: May 2013 – September 2013
Project Details: Concept design report for 388Km long Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway (Narrow Gauge & Standard Gauge)

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: October 2012 – April 2013
Project Details: Concept design and Front-End Engineering design for 65 Km New Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway {Narrow Gauge & Standard Gauge}.

Location: Queensland, Australia
Client: NRW, Australia
Duration: April 2013
Project Details: Design and preparation of BOQ for Water infrastructure for construction including a new dam and pipeline for water conveyance, Pavement for proposed airport and corresponding facilities, Landfill.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: August 2011 – February 2012 | June 2012 – February 2013
Project Details: Concept design of new greenfield heavy haul railway project, connecting Carmichael Mine to Aurizon’s existing Rail System through Moranbah (East-West Line).

Location: Western Australia
Client: BCI Minerals
Duration: Feb 2023 – Apr 2023
Project Details:  Design review and Value engineering for the Access Road to the jetty

Location: Sydney, NSW, Australia
Client:  Pinsent Masons
Duration: Nov 2022 – March 2023
Project Details: Analysis and reporting of welding of the rails on sections of the Sydney Light Rail Project (SLR Project).

Location: Queensland, Australia
Client: Bowen Rail Company, Australia
Duration: Nov 2022 – March 2023
Project Details: Concept design for Passing loops expansion and Mineloop reconfiguration to increase the capacity of Carmichael Mine Rail Project

Location: Queensland, Australia
Client: Bowen Rail Pty Ltd
Duration: February 2020 – April 2021
Project Details:Detailed design for rail provisioning and maintenance yard involving design of rail alignment, tracks, earthworks, drainage, service track, signalling and facilities

Location: Queensland, Australia
Client: Seymour Whyte Constructions Pty Ltd
Duration: October 2020 – February 2021
Project Details: Drafting of As-constructed drawings as per the client requirements

Location: Queensland, Australia
Client: North West Rail Pty Ltd
Duration: September 2019 – December 2019
Project Details: Feasibility design of Provisioning Yard – MCA analysis, Option Selection & Feasibility design based on Hydraulic design, Rail Alignment, Operations etc., Material Take off.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: April 2017 – May 2018
Project Details: Hydrology & Hydraulic design, Drainage and Crossings design for 382km long heavy haul rail line.

Location: Queensland, Australia
Client: Fulton Hogan
Duration: January 2016 – June 2016
Project Details: Design and construction of 2 QR timber bridge replacement of Kings Bridge (72m long) and German Bridge (15m long).

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: December 2015 – January 2016
Project Details: Assess the alternate connection location with Aurizon and recommend the best option from considerations.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: May 2013 – September 2013
Project Details: Concept design report for 388Km long Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway (Narrow Gauge & Standard Gauge)

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: October 2012 – April 2013
Project Details: Concept design and Front-End Engineering design for 65 Km New Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway {Narrow Gauge & Standard Gauge}.

Location: Queensland, Australia
Client: NRW, Australia
Duration: April 2013
Project Details: Design and preparation of BOQ for Water infrastructure for construction including a new dam and pipeline for water conveyance, Pavement for proposed airport and corresponding facilities, Landfill.

Location: Queensland, Australia
Client: Logan City Council, Australia
Duration: July 2022 – August 2022
Project Details: Civil Design works to reduce the dead loads of surfacing and design of asphalt resurfacing

Location: Queensland, Australia
Client: Logan City Council, Australia
Duration: March 2022 – June 2022
Project Details: Load assessment for a 5 NHVR vehicle applications, 4 standardised assessment vehicles and T44 design load.

Location: Queensland, Australia
Client: Bowen Rail Pty Ltd
Duration: June 2021 – June 2022
Project Details: RFI and construction query support to client. As-built engineering support and certification

Location: Queensland, Australia
Client: Bravus Mining and Resources
Duration: October 2020 – April 2022
Project Details: RFI support to client, based on queries from contractors/ As Built Engineering support and certification

Location: Queensland, Australia
Client: Dowen Rail Pty Ltd
Duration: April 2020 – October 2020
Project Details: Detailed design of provisioning yard connection point into the Aurizon Network’s ‘Newlands System’

Location: Queensland, Australia
Client: Adani Mining Pty Ltd
Duration: February 2020 – September 2020
Project Details: Detailed Design work including Civil, H&H, Alignment, Drainage, Geotech, Bridges, Culverts for 200 km of rail line.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: September 2019 – March 2020
Project Details: Design support for client to undertake Detailed Design Review in the field of Civil and Signalling.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd
Duration: December 2019 – February 2020
Project Details: Design review (including Civil, H&H, Alignment, Drainage Geotech, Bridges, Culverts) of DCP3 deliverables for 200 km Rail Line.

Location: Varsity to Burleigh, Queensland, Australia
Client: Seymour Whyte Constructions Pty Ltd
Duration: January 2020
Project Details: Material Take off/Quantity estimation.

Location: Queensland, Australia
Client: NRW, Australia
Duration: December 2014
Project Details: Design and preparation of BOQ for Road Alignment, Pavement Design, Hardstands, Catchment delineation and 1D modeling of all culverts along the road, Construction of water pond.

Location: Queensland, Australia
Client: POSCO E&C
Duration: June 2014 – December 2014
Project Details: Collaborative work with WorleyParsons project team to deliver the Basic Engineering report / FEED report for 388Km long Heavy Haul Rail for 32.5 tonne axle loads Dual Gauge Railway {Narrow Gauge & Standard Gauge}.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Austra alia
Duration: October – November 2014
Project Details: Adani Mining is proposing to develop thermal coal mine in North Galilee Basin, Central Queensland. For the effective operation of mine, suitable road link to the major regional centres of Townsville, Mackay and Rockhampton must be established. This project consists of design of 90 km long road between Elgin-Moray Road and Moray- Carmichael Road which is at present a rural unsealed road. Design works for hydrologic, hydraulic and structure design were undertaken.

Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: August 2011 – February 2012 | June 2012 – February 2013
Project Details: Concept design of new greenfield heavy haul railway project, connecting Carmichael Mine to Aurizon’s existing Rail System through Moranbah (East-West Line).